Datalog drilling fluid hydraulics manual
Also called swamp barge. The inland barge rig is the oldest form of marine rig. It consists of two hulls, which are connected by legs. The upper hull is air tight and provides the buoyancy necessary to float the rig to each site.
The rig is positioned over the site and the lower hull is flooded. This causes the rig to sink until it rests on the sea floor. After drilling the well, the rig is re-floated and moved to a new location. The inland barge rig is limited to working in relatively shallow water, less than 50 feet normally.
They are also hard to move to new locations. Basic Mud Logging 6. Tension leg platforms: The Tension Leg Platform is one of the newest types of rig available. It is a combination of a semi-submersible rig and a platform rig.
It is used strictly for production drilling. Normally, some of the wells in the field have already been drilled, and then the TLP is positioned over the pre-drilled wells and the production lines run to the existing wellheads. They are set up with drilling equipment in the event other wells need to be drilled, or any existing wells must be worked over. The current technology allows the TLPs to work in up to 5, feet of water.
The platform is permanently moored by means of tethers or tendons grouped at each of the structure's corners. A group of tethers is called a tension leg. A feature of the design of the tethers is that they have relatively high axial stiffness low elasticity , such that virtually all vertical motion of the platform is eliminated.
This allows the platform to have the production wellheads on deck connected directly to the subsea wells by rigid risers , instead of on the seafloor. This allows a simpler well completion and gives better control over the production from the oil or gas reservoir, and easier access for downhole intervention operations.
TLP's have been in use since the early s. Larger TLP's will normally have a full drilling rig on the platform with which to drill and intervene on the wells. The smaller TLPs may have a workover rig, or in a few cases, no production wellheads located on the platform at all. The typical rig shown in the next figure shows the layout of most component parts. Use this layout as you read about each system on the rig.
Not all rigs are arranged the same. Newer rigs use modular designs and space saving techniques. The main rig components are as follow: 1. Crown Block and Water Table 2. Cat-line Boom and Hoist Line 3. Drilling Line 4. Monkey board 5. Traveling Block 6. Top Drive 7. Mast 8.
Drill Pipe 9. Doghouse Blowout Preventer Water Tank Electric Cable Tray Engine Generator Sets Fuel Tanks Electric Control House Mud Pump Bulk Mud Components Storage Mud Pits Reserve Pits Mud Gas Separator Shale Shaker Choke Manifold Pipe Ramp Pipe Racks However, all rigs must have five basic systems or operations performed. These include: 1. Hoisting system: used to raise and lower drill pipe, casing, and tubing.
Circulating system: used to remove cutting and maintain pressure in the well bore. Rotating system: used to turn the drill stem to make hole. Power production system: used to produce mechanical and electrical power. Blowout prevention system: used to seal off the well bore to control formation fluids. Derrick or mast: A standard derrick is a structure with four supporting legs resting on a square base.
It can be assembled piece by piece each time a well is drilled. In contrast, the mast is assembled once when it is manufactured. After manufacture, it remains a single unit each time a well is drilled.
When a mast is raised and lowered, it looks something like the blade of a huge jackknife being opened and closed. As a result, masts are sometimes referred to as jackknife masts. For most offshore drilling rigs, the derrick is the standard. To support the rig floor, providing space for equipment and workers. To provide space under the rig floor for special, large valves called blowout preventers. The substructure supports not only the rotary table, but also the full load of the drill string when the string is suspended in the hole by the slips.
It also supports a string of casing when the casing is being run in the hole by an arrangement of slips resting on the rotary. The rig floor also holds the draw works, the drillers control panel, the doghouse, and other related equipment.
Derricks and masts are rated according to the vertical load they can carry and the wind velocity they can withstand from the side. Derrick loadbearing capacity figures may vary from , to 1,, pounds. A typical mast or derrick can withstand winds of about to miles per hour with the racks full of pipe and without the need for external bracing.
The derrick and its substructure support the weight of the drill string at all times, whether the drill string is suspended from the crown block or resting in the rotary table. The height of a derrick does not affect its load-bearing capacity, but the length of the sections of drill string to be removed from the hole is limited by the height of the derrick. This is because the crown block must be sufficiently elevated above the rig floor to permit the withdrawal and temporary storage of the drill string when it is pulled from the well to change bits or for other reasons.
Drill pipe is pulled and racked in stands. A stand usually consists of three joints of pipe, each about 30 feet long. Such a stand, having a total length of some 90 feet, can be accommodated in a derrick that is feet high or higher.
Rigging-up time is the time spent to assemble a mast into the vertical position on-site. It also includes the time to install the power unit, all cables and piping. Masts are used for lighter work. Hoisting system: The draw works, sometimes called the hoist, is a big heavy piece of machinery that consists of a revolving drum around which the wire rope, called the drill line, is spooled or wrapped. It also has a cat-shaft, a kind of axle that crosses through the draw works that has a revolving drum called a cat-head spool on both end and two special cat-heads.
Several other shafts, clutches, and a chain-and-gear drive facilitate speed and direction changes. An integral part of the draw works is a system of speed changes transmission system.
This transmission system as shown in the next figure gives the driller a wide choice in hoisting the pipe. Thus, the drum of the hoist may be considered as having a minimum of four and often as many as eight speeds. Basic Mud Logging The origin of the term draw works is not actually known, but probably is related to the fact that part of the function of the draw works is to draw pipe out of the hole. The two main purposes of the draw works are: 1.
To lift pipe out of the hole. To lower the pipe back into the hole. Wire rope is reeled, or spooled, on a drum in the hoist. When the draw works is engaged, the drum turns and, depending on the direction it either turns, reels in the drill line to raise the traveling block or lets out the line to lower it. Since the drill string is attached to the block by the elevators, the string is thus raised or lowered.
One of the outstanding features of the hoist is the brake system, which enables the driller to easily control a load of thousands of pounds of drill pipe or casing.
On most rigs, there are at least two brake systems. One brake is mechanical and can bring the entire load to a full stop. The other brake is hydraulic or electric and can control the speed of the descent of a loaded traveling block, although it is not capable of bringing it to a complete halt. Another feature of the draw works is the cat-shaft with its two special cat-heads.
The makeup spinning cat-head on the drillers side of the draw works is used to spin up and tighten the drill pipe joints. The other, located opposite the drillers position on the draw works, is the breakout cat-head. It is used to loosen the drill pipe when the pipe is withdrawn from the hole. Blocks and drilling line: The traveling block, crown block, and drilling line are the three components whose function is to support the load of drill pipe in the derrick as it is lowered into or pulled from the hole.
During drilling operations, this load consists of the hook, swivel, kelly, drill pipe, drill collars, and a bit attached to the bottom of the drill collars. During cementing operations, a string of special pipe called casing, often a heavier load than the drill pipe and drill collars, has to be lowered into the hole and cemented. Drill line is usually made of wire rope that generally ranges from 1.
Wire rope is similar to common fiber rope, but wire rope, as the name implies, is made of steel wires and is a complex device. Although the wire rope looks very much like cable, it is specially designed for the heavy loads encountered on the rig. To achieve the greatest economy from the use of wire on a drilling rig, the line selected should be in accord with both the load requirements and the design of the sheaves in the traveling block and crown block through which the line must travel.
The line should be frequently inspected to ensure that it is in good condition. The drill line should be moved periodically slipped in the field term so that it wears evenly as it is used. Cut off procedures should take into account the amount of usage or work done by the wire rope. Wire rope wear is determined by the weight, distance, and movement of wire rope travel over a given point ton-miles.
Traveling block The drill line is threaded over a crown block sheave and lowered down to the rig floor. On the rig floor rests temporarily another very large set of pulleys or sheaves called the traveling block.
The end of the line is threaded through one of the traveling block sheaves and is raised again up to the crown block. There the line is threaded over a sheave in the crown block, lowered back down, and threaded through the traveling block.
This is done a number of times until the correct number of lines has been strung up. The number of lines, of course, is only one; but, since the drill line is threaded through the crown block and traveling block several times, it gives the effect of many lines.
The number of lines strung depends on the weight to be supported. The more weight to be supported, the more lines that are needed and vice versa. Once the last line has been strung over the crown block sheaves, the end of the line is lowered down to the rig floor and attached to the drum on the draw works.
Several wraps of line are then taken around the draw works drum. The part of the drill line running out of the draw works up to the crown block is called the fast line; fast because it moves as the traveling block is raised or lowered on the derrick.
The end of the line that runs from the crown block down to the supply reel is then secured. This part of the line is called the deadline; dead because, once it is secured, it does not move.
Mounted on the rig substructure is a device called a deadline anchor. The deadline is firmly clamped to the anchor. Elevators: Two elevators are hung from the hook on the elevator bails and are used for latching around the drill pipe in order to lift it.
Elevators are of many slightly differing designs and sizes for use with different pipe sizes, drill collar and casing sizes. They are not used during the drilling operation but are necessary for lifting the pipe during tripping operation. Elevators are a set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole.
The driller lowers the traveling block and the elevators down to a point where the drill crew can latch the elevators onto the drill pipe. Slips: These devices are used to hold the weight of the drill string when it is not supported by the hook during connections or tripping time. Slips are made of hinged sections with a single opening. They are placed around the pipe, their tapered outer sections fitting against either the inside surface bowl or the master bushing or against the inserts.
As the pipe is lowered, the slips tapered section causes them to close tightly around the pipe. The downward motion of the drill pipe must be stopped with the draw works brakes, not with the slips.
The drawing shows the effects of stopping the motion of the pipe with slips. This can occur when the floor hands are not careful to set the slips at the proper time when the driller has stopped the pipe. Do not let the slips "ride" on the pipe while the pipe is being pulled out of the hole. This practice accelerates the wear on the gripping elements of the slip.
It also risks having the slip ejected from the master bushing bowl when a tool joint comes through and causing possible injury to personnel. Be careful not to catch the tool joint box in the slips when the driller slacks off. This often happens when coming out of the hole and the driller does not pick up high enough for the slips to fall around the pipe properly.
This can ruin the slips, damage the tool joint box and damage the body of the pipe. Rotating equipments: The rotating equipment from top to bottom consists of the swivel, the kelly, the rotary table, the drill string and the bit. The drill string is the assembly of equipment between the swivel and the bit, including the kelly, drill pipe and drill collars. The term drill string simply refers to the drill pipe and drill collars; however, in the oil field, drill string, is often used to mean the whole works.
Swivel: The swivel is a remarkable mechanical device; it is attached to the traveling block by a large bail. The swivel has three main functions: 1. It supports the weight of the drill string. It allows the drill string to rotate.
It provides a pressure tight seal and passageway for the drilling mud to be pumped down the inside of the drill string. The fluid comes in through the gooseneck, a curved pipe that connects the swivel to a hose kelly hose carrying the drilling fluid from the mud pumps. The fluid then passes through the wash pipe, a vertical tube in the center of the swivel body, and into the kelly and drill string.
Basic Mud Logging Kelly and rotary table: The kelly is a three, four, or six-sided length of pipe, about 50 feet long, that is the upper part of the drill string. It serves as a passageway for the drilling fluid on its way into the hole and transmits the rotary movement to the drill pipe and bit. An upper kelly cock is a special valve that can often be recognized as a bulge on the upper part of the kelly.
The kelly cock can be closed to shut off well pressure coming up from inside the drill string. Most kelly cocks require a special wrench to operate the closing valve. A lower kelly cock also called a drill pipe safety valve or a drill string valve is usually made up between the lower end of the kelly and the top joint of drill pipe.
When the kelly is pulled up high above the rotary table, as it usually is when a joint of pipe is being added to the drill string i. However, the lower kelly cock is readily accessible when the kelly is raised.
The kellys upper end is connected to the swivel, and its lower end is connected to the drill pipe. The drill pipe screws into a device called a kelly saver sub, or a saver sub.
The sub is a short, connecting fitting that screws into the bottom of the kelly. The bottom threads on the sub are temporarily joined with threads on the top of each length of drill pipe that is added to the string. The sub saves wear on the threads of the kelly; when the threads of the sub become worn, the sub is replaced and rethreaded. The kelly fits into a corresponding square or hexagonal opening in a device called a kelly, or drive bushing. The kelly bushing fits into a part of the rotary table called the master or rotary bushing.
As the rotary bushing rotates, the kelly rotates; and as the kelly rotates the drill string and bit. Rotary drilling derives its name from the rotary table. The rotary table is powered by the compound or by its own electric motor. Basic Mud Logging Top drive system: The top drive system is replacing the kelly and rotary table on many rigs. This one piece of equipment replaces both the kelly and rotary table. The basic model is an equipment with one pinion powered by a hydraulic motor located on top of the gearbox.
Top drive system advantages:. The top drive make-ups and breaks-out many connections, thereby reducing the hazards of rotary tongs and spinning chain.
The pipe handling features use hydraulic arms to move drill pipe and drill collars to and from the V-door and monkey board, thereby reducing strenuous work and increasing pipe handling safety.
The automatic, driller operated pipe elevators eliminate accidents caused by drilling crews operating elevators manually during under balanced drilling operations. Well control capability is greatly enhanced because of the ability to screw into the string any point in the derrick to circulate drilling fluids.
Remote operated Kelly valve reduces optional mud spillage when back reaming or breaking off after circulating above the rig floor. Reduce total drilling costs by increasing drilling efficiency. No drilling downtime caused by the inability to engage the kelly bushing in the rotary table. Eliminate time lost due to picking up or racking back the swivel and kelly when going from tripping to drilling or vice versa.
Increase penetration rates when spilling in or drilling the surface hole. Eliminate rat hole contractor charges and costs of rat hole, mouse hole and conductor pipe in many cases. Make connections on the bottom while directional drilling, eliminating the need to re -orient the tool face after each connections. Spend more time on bottom making the hole and less time making connections, tripping, surveying, reaming and other non drilling rig functions.
Continuous rotation and circulation during full movement of The Drill String. The most important feature of the top drive is the ability to rotate and pump continuously while reaming into or out of the hole. Continuous rotation means substantially reduced friction when removing the string from or tripping back into directional or horizontal wells. Top drive system.
Basic Mud Logging Drill string: The drill string is made up of the drill pipe and special, heavy-walled pipe called drill collars.
Each length of drill pipe is about 30 feet long and is called a joint of pipe. Each end of each joint is threaded. The end of the joint with the interior threads is known as the box, and the end of the joint with the exterior threads is called the pin.
When pipe is made up, the pin is stabbed into the box and the connection tightened. The threaded ends of the pipe are called tool joints and are actually separate parts that are welded onto the ends of the drill pipe by the manufacturer who cuts the threads to industry specifications. Drill collars, like drill pipe, are steel tubes through which mud can be pumped.
Drill collars are heavier than drill pipe and are used on the bottom part of the drill string to put weight on the bit. This weight presses down on the bit to get it to drill. Drill collars are about 30 feet long and, unlike the drill pipe that has tool joints welded on, they have the boxes and pins cut into them. Basic Mud Logging Stabilizers: These are run between the drill collars and are of a blade type construction.
Drilling fluid can pass freely between the blades while the outer edge of the blades contacts the wall of the hole and holds the drill collars firmly centered in the hole. They do exactly as their name implies, they provide stability to the bit and collars. This is important as it improves bit life, in addition to keeping the direction of the hole under control.
The purpose of the stabilizers is to centralize the collars and to keep the hole straight. The faces of the stabilizer fins are coated with hard material such as tungsten carbide to reduce wear and tear.
Reamers: Reamers usually have the same diameter as the bit and run a little distance above it. The reamer function is to cut the hole out to full size behind the bit. There are many types of reamers depend on the formation that they will pass through. For example, roller reamers are classified into three roller cutter types: Soft formation cutters deliver maximum reaming action in soft formations like soft limestone and shale.
Service life of cutter is enhanced with hard end and carburized teeth. Medium to hard formation cutters are most suitable for cherty formations to hard formations such as dolomite, hard limestone and chert.
Very hard formation cutters deliver reliable reaming performance in hard, abrasive and semi-abrasive formations such as granite and sand. Bumper Sub: Bumper subs are currently used in offshore operations to permit a constant weight to be carried on the bit while drilling, regardless of the vertical motion imparted to the drill pipe by drilling vessel heave.
The vertical motion of the lower end of the drill pipe the bumper sub end may be appreciably greater than the vessel heave. Therefore, the necessary stroke of bumper subs for successful operation is greater than thought in the past. In addition, there is an appreciable tendency of the drill pipe to buckle above the unbalanced type of bumper sub.
Thus, more drill collars than previously used should be carried above unbalanced bumper subs to keep drill pipe straight. They can be used to crossover from one connection size to another or as the disposable component used to extend the connection life of a more expensive drill stem member.
Rotary subs are available with box x pin, box x box or pin x pin connections. The rotary subs include the following types: Straight OD sub is used to connect drill string members that have a similar outside diameter. The drill bit, downhole tools, heavy weight drill pipe and drill pipe can be crossed over using a straight OD sub. Reduced section sub is used to connect drill stem members that have different diameters that warrant the cross-sectional change necessary to accommodate different connections.
This sub would be used to crossover large OD drilling tools or a tapered drill collar string. If the pressure is reduced below the formation pore fluid pressure, then two things can result: -.
With impermeable shale type formations, the underbalanced situation causes the formation to fracture and cave at the borehole wall. This generates the familiar pressure cavings that can load the annulus and lead to pack off of the drill string. With permeable formations, the situation is far more critical and, simply, the underbalanced situation leads to the invasion of formation fluids, which may result in a kick.
In addition to these frictional pressure losses, a piston type process can lead to further fluid influx from permeable formations. When full gauge tools such as stabilizers are pulled passed permeable formations, the lack of annular clearance can cause a syringe type effect, drawing fluids into the borehole. Beside the well safety aspect, invasion of fluids due to swabbing can lead to mud contamination and necessitate the costly task of replacing the mud.
Pressure changes due to changing pipe direction, eg during connections, can be particularly damaging to the well by causing sloughing shale, by forming bridges or ledges, and by causing hole fill requiring reaming. To determine the new hydrostatic pressure, the differential pressure is either added or subtracted depending on whether surge or swab respectively.
Firstly, the Fluid Velocity of the displaced mud caused by the pipe movement has to be calculated. This fluid velocity then has to be converted to the equivalent flowrate by using the annular velocity equation, where: -. This is calculated for both laminar and turbulent flow with the largest value being taken. Thus, a safe speed can be deduced in order to avoid excessive pressures.
Required information: Bit depth and hole depth Taken from the realtime system, editable if required. Limits defined by the user. Negative values should be used in order to calculate swab pressures. Read from realtime system, editable if required. Once the data is entered correctly: Press F7 to calculate the maximum and minimum pressures. Press F2 to print the data out. Press F8 to produce a plot. This program accesses information from the realtime system.
Therefore: Enter the hole and pipe profiles from Exercise 1c into the realtime files. Enter the following into equipment tablea Mud density override 9. With an increased mudweight of Exercise 1a Use of Hydraulics Program 1. Laminar flow in all sections System pressure loss psi Surface pressure loss Yes, flow is laminar in each section 8.
Exercise 1b Optimizing hydraulics 1. Two possible situations are: a. Mud weight 9. Mud weight Exercise 1c Optimizing Hydraulics 1. With flowrate mud weight jets 1. Exercise 1d Equivalent Circulating Densities 1.
Buka menu navigasi. Tutup saran Cari Cari. Pengaturan Pengguna. Lewati carousel. Karusel Sebelumnya. Karusel Berikutnya. Apa itu Scribd? Jelajahi eBook. Terlaris Pilihan Editor Semua eBook. Jelajahi Buku audio. Terlaris Pilihan Editor Semua buku audio. Jelajahi Majalah. Pilihan Editor Semua majalah.
Jelajahi Podcast Semua podcast. Kesulitan Pemula Menengah Lanjutan. Jelajahi Dokumen. Hydraulics v2 1. Diunggah oleh Anca Seserman. Apakah menurut Anda dokumen ini bermanfaat? Apakah konten ini tidak pantas? Laporkan Dokumen Ini. Tandai sebagai konten tidak pantas.
Unduh sekarang. Simpan Simpan Hydraulics v2 1 Untuk Nanti. Judul terkait. Karusel Sebelumnya Karusel Berikutnya. Advances in drilling hydraulics and drilling fluid rheology-Kelessidis. Lompat ke Halaman. Cari di dalam dokumen. The principle roles of the mud are: Lubrication and cooling of the drill bit and the drillstring Removal of drilled cuttings from the annulus Bottom hole cleaning Control of subsurface formation pressures Transmit hydraulic horsepower to the bit Help support the weight of the drillstring Aid formation stability Aid in formation evaluation Protect formation productivity 1.
Cuttings need to be removed from the annulus for a number of reasons: to prevent loading of the annulus to keep annular pressure to a minimum to allow for free movement and rotation of the drillstring so that the cuttings reach the surface in such a condition that they can be evaluated by a geologist to accurately interpret the downhole geology This principle is not only determined by the physical properties of the mud but by the type of flow pattern present in the annulus.
Broadly, they can be grouped into the following categories: Water Based including gel and polymer muds Oil Based, including Invert Emulsions Synthetic or Mineral oils World Oil, June , is the main source of this classification 2. Potassium bearing chemicals Provide greater shale inhibition Calcium Muds Calcium or magnesium addition to freshwater drilling muds reduces, or inhibits, the swelling and hydration of clays and shales.
Saltwater Muds are prepared from either fresh or brine water and salts added to the desired level of concentration. Problems for interpretation of log information Cost Oil based muds contain only oil in the liquid phase, and although they may pick up formation water, no additional water or brine is added. To reduce friction, thereby reducing torque and drag Bentonite clay, lignite, polyacrylate, pregelatinized starch.
Salt, hydrated lime, gypsum, soda ash, bicarbonate of soda, polymers Flocculants Lubricants Oils, synthetic liquids, graphite, glycol or surfactants Detergents, soaps, oils, surfactants Soluble calcium or potassium, inorganic salts, organic compounds. Pipe-freeing agents To reduce friction and increase lubricity at the point where the pipe is stuck. Shale inhibition Surfactants Emulsifiers, de-emulsifiers, wetting agents, flocculants or de-flocculents, depending on the surfaces involved.
Acrylic or sulphenated polymers, lignite, lignosulphate, tannin Tannins, lignite and lignosulphates, polyphosphates Thinners, Dispersants These modify the relationship between viscosity and solids volume, reducing gel strength and increasing the pumpability of a fluid. Viscosifiers Increase viscosity, providing better solid suspension and hole cleaning.
Normal units of measurement lb ft2 With the duration of a drilling operation, i. Disadvantages: erosion of cuttings, thereby destroying interpretative properties the possibility of hole erosion increased pressure losses due to higher frictional forces from the fluid movement, faster velocities and more contact with the wall removal of mud filter cake Another advantage of turbulent flow comes during cementing operations, since the random flow helps to dislodge mud cake from the borehole walls.
The average fluid velocity annular velocity or pipe velocity is determined using the following formulae: 5. The power expended or used up by the bit is a proportion of the total power available HPt.
Higher circulating pressure will result in: Greater overbalance in comparison to the formation pressure Increased risk of formation flushing More severe formation invasion Increased risk of differential sticking Greater load exerted on the surface equipment The increased pressure is termed the Dynamic Pressure or Bottom Hole Circulating Pressure BHCP. TVD ft Mud density 9. If the pressure is reduced below the formation pore fluid pressure, then two things can result: - 1.
Current running speed Once the data is entered correctly: Press F7 to calculate the maximum and minimum pressures. With Dokumen Serupa dengan Hydraulics v2 1. Heris Sitompul. Angel Ngo. Usama Bin Sabir. Anca Seserman. Abhinav Goyal. Karlos Rdgz. Muhammad Jufri. Sergio Ramirez. Mohamed Alghrbawy. Dianna Ariza R. Brahim Letaief. Tarek Hassan. Vassilios Kelessidis. Herry Suhartomo. Kolawole Adisa.
Jhon Alfonso. Lainnya Dari Anca Seserman. Introduction to Integrated Reservoir Characterization. Unitatite structurale majore ale teritoriului Romaniei - cap. Laura Johnson. Goldring - Ichnofacies and Facies Interpretation.
Once finished hit the red. Be sure to select Save All. Please email the file back the file in the email that we sent the instructions to you in. Common Datalog Idle log. RPM log. Stopping at rpm intervals. Driving log. Vary speed, throttle position and acceleration rate from a stop. WOT log. Use the lowest gear you can but not spinning tires.
Have Questions? Need some advice? Si el nivel del lodo del anular sube, el pozo esta fluyendo con lodo desplazado en la parte superior del hueco debido a un influjo en el fondo del pozo.
A estas alturas, el pozo debe ser cerrado cerrando el preventor anular para controlar el influjo. Sobrecarga en el anular por los cortes. Esto es conocido como carga del gancho hookload i. Cuando la sarta esta fuera de fondo y sin movimiento, la carga del gancho es igual al peso efectivo de la sarta cuando el bloque soporta todo el peso de la misma.
Esto es conocido como el peso sobre la broca. Utilizando nuestra propia celda de carga seremos independientes del equipo monitoreando nuestro propio sistema de peso. El peso visto en superficie no es el mismo que esta siendo aplicado en la broca. De igual forma una velocidad lenta causara un torque bajo.
PinzadeTorque La medida del torque varia, dependiendo del tipo de fuente que maneje el sistema rotatorio. Es por consiguiente muy importante que los cambios en el torque sean evaluados y determinadas las causas que lo generaron. Un broca PDC, por otro lado, puede mostrar un torque completamente diferente y un cambio tan pronunciado puede no ser visto. Velocidad de rotacion Torque de la rotaria Incremento del torque Tiempo Rotacion detenida De la misma manera, si conocemos la velocidad de la bomba, podremos determinar cuanto tiempo tomara esto.
Este tiempo puede ser dividido en dos eventos, tiempo de bajada superficie a la broca y el tiempo de retorno broca a superficie. Estos retornos en las muestras siempre deben estar basados en los golpes requeridos en lugar del tiempo, ya que la velocidad de bombeo puede cambiar. Necesitamos conocer exactamente el numero de golpes de bomba que se necesitan para que el lodo de matar el pozo alcance la broca, la zapata del revestimiento y la superficie. Transferencia de tanques o desde una fuente externa.
Cambios similares cuando los equipos de superficie, centrifugas, desarenadores, son encendidos o apagados. Cambios aparentes cuando los agitadores son apagados o encendidos. Movimiento de las olas en equipos flotantes. Note que las abreviaturas no se usan en este manual, ya que las operaciones siempre tienen diferentes requerimientos sobre su uso.
Se debe utilizar la tabla apropiada de colores, para que todas las descripciones sean consistentes entre el personal diferente. Prueba del Cloruro Para confirmar la presencia de sal o halita NaCl , el logger, puede, si lo desea, probarla!
El machamiento de los hidrocarburos pesados tiende a ser de colores pardo oscuros, mientras que el de los hidrocarburos livianos tiende a ser de colores claros a incoloros.
Ya sea de cualquier forma, su apariencia es importante y se debe registrar. Esto es conocido como fluorescencia. Muchos otros materiales fluorescen y se tienen que eliminar para no incurrir en errores en la fluorescencia real del aceite. Generalmente, el diesel y los fluidos base aceite muestran una fluorescencia parda opaca. Cualquier muestra que presente manchamiento se debe separar y analizar bajo el fluoroscopio. Minerales Los carbonates generalmente muestran una fluorescencia amarilla a parda.
La anhidrita o yeso da una fluorescencia gris azulosa. El solvente, efectivamente, penetra en la muestra, disolviendo el aceite y removiendo de esta. A baja permeabilidad, corte lento. Los factores interrelacionados tales como calidad de la permeabilidad, viscosidad y solubilidad del aceite, que conducen a una completa movilidad del fluido, contribuyen todas a la velocidad del corte.
En hongo uniforme Uniform blooming Fluido Streaming Buena permeabilidad y movilidad del aceite. Entonces el corte triturado crush se debe describir de la misma manera como el corte del solvente. Repita usando una muestra seca. Agregue HCl. Esto, obviamente, proporciona una oportunidad para determinar el color natural verdadero lejos del color background de la muestra. Para un aceite en particular, esto es ciertamente verdadero.
Sin embargo, este resultado cuantitativo depende del tipo de aceite, ya que diferentes aceites presentan diferentes niveles de fluorescencia para una longitud de onda ultravioleta dada. Sin embargo, como con cualquier prueba de muestras de ambiente continuamente cambiante, hay limitaciones en el procedimiento.
If the zone has been flushed ahead of the bit, then the hydrocarbon content in the resulting cuttings is reduced. If the formation is extremely permeable, much of the oil especially light oil and condensates will have been liberated to drilling fluid and go undetected in the cuttings. Las medidas se pueden hacer cada 5 o 10m. Obviamente, se deben hacer lo mas frecuente posible para obtener un gradiente mas preciso. Durante este tiempo, pueden absorber el fluido, cambiando su densidad original.
Datalog usa Poliungstato de sodio 2. Use lectores de vidrio de densidad, con rangos desde mas ligeramente pesados que le agua mas liviana a ligeramente mas livianos que el SPT, es decir, 1. Agregue a25 ml de SPT. Siga las siguientes instrucciones.
Para generar una zona mezclada se deben realizar 10 o 15 inclinaciones. Determine si la zona mezclada graduada es suficiente grande y lineal, si no, agite e incline de nuevo, para mejorar la mezcla.
Arcillas subcompactadas en zonas sobre presurizadas son tipificadas por el hecho de que han sido deshidratadas propiamente, siendo el contenido de esmectita usualmente alto. Superior por ejemplo. Siga el mismo procedimiento anterior. Manual - seleccione Analyse - Seleccione Break. Si la bandeja solo cubre una parte de la zaranda, el flujo de los cortes es uniforme o se concentra en los extremos por ejemplo?
Entonces una parte del volumen medido, hace parte del volumen del lodo mas que de los cortes. El resultado final es, por lo tanto, una medida semi-cuantitativa, aunque no muy exacta. Por ejemplo, Una bandeja de 15 galones tarda 15 minutos en llenarse Para cinco bandejas, el tiempo que toman en llenarse es de 13 minutos…..
La profundidad laggeada en este tiempo fue de Esto significa que una vez se ha hecho la medida, es decir, la bandeja se ha llenado, el tiempo se tiene que registrar. La bandeja se debe vaciar y el proceso completo comienza de nuevo inmediatamente. Observe el ejemplo.
El peso del lodo tiene que ser correcto para permitir la boyancia de la sarta. Estos valores son nominales ya que las secciones de las cajas tool joints no se consideran.
0コメント